1974 EZGO Restoration

BBBLUE

Member
Ok...steering is in, awaiting alignment. Throttle and brakes are in and adjusted...motor and control cables are made up and waiting for small wires and batteries. Body work and paint next.
 

Attachments

  • 20201017_104115.jpg
    20201017_104115.jpg
    80.7 KB · Views: 10
  • 20201017_104137.jpg
    20201017_104137.jpg
    74.7 KB · Views: 10
  • 20201017_104154.jpg
    20201017_104154.jpg
    73.3 KB · Views: 10

BBBLUE

Member
I got the molding on...heat gun and a modified "church key" can opener. Batteries are in and cabled. Wiring is done to key and F-R switch....no smoke...fwd and rev work but the rev buzzer doesn't...more testing tomorrow.
 

Attachments

  • 20201214_172622.jpg
    20201214_172622.jpg
    90.5 KB · Views: 7

BBBLUE

Member
Well, the top is back on, upholstery is in process, cup holder is in, bag straps are on, it's on its wheels....alignment is next....then some special decals....stay tuned
 

Attachments

  • 20210102_193857.jpg
    20210102_193857.jpg
    55.9 KB · Views: 12
  • 20210102_193918.jpg
    20210102_193918.jpg
    71.7 KB · Views: 12
  • 20210102_193937.jpg
    20210102_193937.jpg
    79.4 KB · Views: 12

Sippi

Member
I can only hope my 76 will ever be able to look that good. By chance would you have the manuals for that year?
 
Top