Ok...steering is in, awaiting alignment. Throttle and brakes are in and adjusted...motor and control cables are made up and waiting for small wires and batteries. Body work and paint next.
I got the molding on...heat gun and a modified "church key" can opener. Batteries are in and cabled. Wiring is done to key and F-R switch....no smoke...fwd and rev work but the rev buzzer doesn't...more testing tomorrow.
Well, the top is back on, upholstery is in process, cup holder is in, bag straps are on, it's on its wheels....alignment is next....then some special decals....stay tuned